View the Outline Planning Application
An Outline Planning Application was submitted in December 2021 for St Helier Waterfront. Continual discussions took place during 2022 with the Planning Department and Statutory Consultees. In response to feedback, adjustments were made to the Application forming an Addendum.
You can view the documents contained within the Addendum to the Outline Planning Application by clicking on the links below.
Environmental Impact Statement Volume 1
Environmental Impact Statement Volume 2
Environmental Impact Statement Volume 3
Appendix 1.1 EIA Competent Experts
Appendix 2.1 Schedule 2 Requirements
Appendix 2.2 EIA Scoping Opinion Request
Appendix 7.1 Construction Employment Calculations
Appendix 8.2 Relevant Planning Policy - TVIA
Appendix 8.3 Townscape and Landscape Character Appraisals
Appendix 8.4 Viewpoint Assessment
Appendix 8.5 AVRs & Methodology
Appendix 9.1 Heritage Impact Assessment
Appendix 10.1 Transport Assessment 2.0
Appendix 10.2 Framework Travel Plan 2.0
Appendix 11.1 Air Quality Assessment Methodology
Appendix 11.2 AQ correspondence with GoJ
Appendix 12.1 Glossary of Acoustic Terminology
Appendix 12.2 Baseline Noise Surveys
Appendix 12.3 Demolition & Construction Assessment Methodology
Appendix 12.4 Road Traffic Noise Assessment
Appendix 13.1 Preliminary Geo-Environmental Risk Assessment
Appendix 13.2 Site Waste Management Plan
Appendix 13.3 Data Review & Technical Waste Assessment
Appendix 14.1 Drainage Strategy (Part A)
Appendix 14.1 Drainage Strategy (Part B)
Appendix 14.2 Flood Risk Assessment
Appendix 15.1 Ramsar Screening Assessment
Appendix 16.1 DSO Policy Context
Appendix 16.2 DSO Technical Analysis Data & Drawings
Appendix 17.1 Pedestrian Level Wind Microclimate Assessment Methodology
Appendix 17.2 Pedestrian Level Wind Microclimate Assessment Outcomes
Design & Access Statement
Design Codes
Design Codes Summary
Planning Statement
Illustrative Plans and Sections
Proposed Masterplan - Basement B1
Proposed Masterplan - Basement B2
Proposed Masterplan - Level 00
Proposed Masterplan - Level 01
Proposed Masterplan - Level 02
Proposed Masterplan - Level 03
Proposed Masterplan - Level 04
Proposed Masterplan - Level 05
Proposed Masterplan - Level 06
Proposed Masterplan - Level 07
Parameter Plans
Supporting Documents
Amended Initial Utilities Assessment
Amended Operational Waste Management Strategy
Arboricultural Impact Assessment
Broad Ecological Enhancement Proposals
Coastal Defence Concept Design Report
La Fregate Structural Assessment
Site Suitability Noise Assessment
Summary of Community Consultation